Tunnel Under the Tracks Just South of the Gym Near Hanshin Ashiya Station Is Now Open

A tunnel passing under the Hanshin Main Line tracks (elevated), located west of Hanshin Ashiya Station and just south of the Shinko Sports Gymnasium & Youth Center (Ashiya Municipal Gymnasium), has opened〜

Narrow Tunnel Under the Tracks South of the Gym Near Hanshin Ashiya Station to Close from Today 7/22

↑Construction had been underway since July this year.

↑Compared to before, it has become a much wider tunnel!

↑Bollards have been installed, so cars cannot pass through, but the ground has been lowered enough that cyclists can ride through without getting off.

↑The view from the south side. You can see the “Shinko Sports Gymnasium & Youth Center (Ashiya Municipal Gymnasium & Youth Center)” on the other side.

↑Because the ground was lowered, handrails have been installed along the sloped sections.

↑It seems to have become much easier and more convenient to pass through when going from the south side to the gymnasium or Takarajimaike Park, or from the north side to Ashiya Post Office〜. While we were taking photos, several cyclists were already using it.

Here is the map↓

Address-wise, it is between Fukaekitamachi and Fukaehonmachi in Higashinada Ward, Kobe City, Hyogo Prefecture, and Kawanishicho and Hiratakitacho in Ashiya City.(A bit confusing〜)

芦屋市の最新求人情報

正看護師・夜勤/住宅型有料老人ホームでの夜勤専従・看護業務
ホスピタルメント芦屋 📍 兵庫県 芦屋市
日給2万4,000円~
芦屋市若宮町/短時間、フルでも可/保育士/扶養内/認可保育園/定員30名
社会福祉法人芦屋こばと福祉会 📍 兵庫県 芦屋市
時給1,116円~1,150円
管理栄養士/栄養士
大東保育所 📍 兵庫県 芦屋市
時給1,116円
家庭科講師
芦屋学園中学校・高等学校 📍 兵庫県 芦屋市
固定報酬3,100円~
Powered by 求人ボックス
? みんなに聞く