Looks Like Construction Is Underway on Shionagi Bridge over the Miyagawa River on Rinko Line

It looks like “Shionagi Bridge” over the Miyagawa River has been undergoing repair work since February 13 due to aging.

↑A notice sign for the bridge repair work. It looks like the work is scheduled to take place from 9:00 to 17:00 until June 30.

↑The view looking north from Shionagi Bridge

↑Shionagi Bridge seen from the north side. Since it carries the Rinko Line across the river, it looks like a very solidly built bridge.

Here’s the map↓

The address is between 1 Takahamacho and 1 Wakabacho, Ashiya City, Hyogo Prefecture (the bridge where the Rinko Line crosses the Miyagawa River).

Seawall Improvement Work Is Also Underway Until March 24

↑Around Shionagi Bridge, work to raise the seawall as a storm surge countermeasure is also being carried out until March 24.

↑Temporary fencing had been set up for the construction work.

↑There was a person with Hinomaru face paint bowing. The long eyelashes are cute.

Lastly

↑Near the bridge, lots of unsuspecting ducks were swimming in the Miyagawa River. They’ll probably be surprised once the construction starts.

芦屋市の最新求人情報

保育士/芦屋市/扶養内勤務可/ブランクOK/残業なし/持ち帰り仕事なし
社会福祉法人山の子会 📍 兵庫県 芦屋市
時給1,356円~1,500円
塾スタッフ
株式会社学研エル・スタッフィング 採用窓口 📍 兵庫県 芦屋市
時給1,150円~1,760円
保育職 ベネッセ運営の保育園「10/29 新着」駅チカ案件
ベネッセの保育園 ベネッセ 芦屋保育園 📍 兵庫県 芦屋市
時給1,175円
リハビリトレーナー・介護職/週1日からOK
医療法人社団吉野医院 甲南山手リハビリステーションアップ 📍 兵庫県 芦屋市
時給1,300円~1,600円
Powered by 求人ボックス
? みんなに聞く